Home > Insignias > STS-46 - STS-100
STS-84 / Discovery Patch

STS-84 / Discovery Patch

Item PASTS084 Price $4.95

This was 19th Atlantis mission and the 6th Shuttle/MIR docking mission. C. Michael Foale stayed aboard MIR, replacing Jerry M. Linenger who arrived on MIR from STS-81. STS-84 transferred water, logistics and returned to Earth with U. S. science materials, Russian logistics, ESA material and miscellaneous material. Landed at Kennedy Space Center, FL. May 24, 1997. Mission Duration: 9 days 5 hours 20 minutes 47 seconds.

Patch description: The STS-84 emblem depicts the Space Shuttle Atlantis launching into Earth orbit to join the Russian Space Station Mir as part of Phase One of the International Space Station program. The names of the eight astronauts who will fly onboard Atlantis, including the two who will change their positions onboard Mir for a long duration flight, are shown along the border of the patch. The STS-84/Mir-23 team will transfer 7,000 pounds of experiments, Station hardware, food and clothing to and from Mir during the five-day period of docking.

The Phase One program is represented by the rising Sun and by the Greek letter Phi followed by one star. This sixth Shuttle-Mir docking mission is symbolized by the six stars surrounding the word "Mir" in Cyrillic characters. Combined, the seven stars symbolize the current configuration of Mir, composed of six modules launched by the Russians and one module brought up by Atlantis on a previous docking flight.

4" diameter embroidered patch.

Availability: Usually ships within one business day.