Home > Insignias > STS-1 - STS-50
STS-2 / Columbia Patch

STS-2 / Columbia Patch

Item PASTS002 Price $4.95

This was the first time that a manned spaceship was reflown with a second crew. The flight was cut from its planned duration of five days because of the failure of one of the three fuel cells that produced electricity and drinking water. The Remote Manipulator System was tested for the first time. Mission scientists were satisfied with the data from "earth-looking" experiments in the payload bay. Space Shuttle Columbia landed November 14, at 1:23 PM EST, at Edwards Air Force Base, CA. Mission duration was two days, six hours, 13 minutes and 12 seconds.

Patch description: Depicts Columbia along with the crewmembers surnames, and the merged eagle and American flag. The number two is significant, as it applies to the number of crewmembers as well as the second flight for the Columbia and the second in a series of Space Shuttle missions.

4" diameter embroidered patch.

Availability: Usually ships within one business day.